Procurement field guide
Construction material sourcing starts with a controlled requirement.
Material sourcing becomes difficult when drawings, takeoffs, approved products, delivery conditions, alternates, and schedule constraints live in different places. A controlled requirement helps suppliers respond on a comparable basis.
